This is our personal project. The boards were sent out for repairs and have now been restored. The glass monitor bezel was cleared and preserved. Next, we need to build a new bottom floor for the cabinet, as the previous one was too rotten to salvage.

Update: Things didn’t go as planned. I ended up uncovering a termite problem when I removed the bottom. I discovered it was all tongue-and-groove and severely water- and termite-damaged. Now, I’m faced with the question: do I need to replace not only the bottom but also the bottom edges of the sides and rear panel, which have also been affected by termites? Yes, all the bad has been removed and replaced.

Done with wood making. Next is sanding and paint blending to look old. Done sanding and painting, on to the next.

Applied new t-molding. Cleaned the wiring harness. Put back the wiring where it was. Boards mounted. Replacing rusted screws and parts as I go, and if I have them. I forgot I had powder-coated the metals (looks too good if you ask me). Monitor back in and tested good. Color overlay cleaned and taped in.

The control panel and joystick have been fully disassembled, de-rusted, cleaned, painted, and oiled. A new joystick dust cover grommet has been created; I cleaned the aluminum panel as best as I can for now. Maybe someday I'll recreate a new silk-screened panel (maybe).

On order is a new 6x9 8ohm speaker and a few non-rusted screws and marquee bulbs. Then this is DONE!

Doesn't Look Bad
Doesn't Look Bad
But it is very Brittle
Ugh!
Ugh!
Ready to Cut
Ready to Cut
Side One Off
Side One Off
Biscuit Ready
Biscuit Ready
Aligning Side Two
Aligning Side Two
Humn
Humn
Front Ready
Front Ready
Termite Eaten Back Panel
Termite Eaten Back Panel
To Be Replaced Entirely
Front Glued
Front Glued
Killed my Bit Bearing
Killed my Bit Bearing
Test Fit
Test Fit
Bottom Cut and Placed
Bottom Cut and Placed
Tapered Fit - Ugh!
Needs a Channel
Needs a Channel
Channel Maker
Channel Maker
Ready for Paint
Ready for Paint
First Coat
First Coat
New T-Molding
New T-Molding
Wiring Cleaned and Going In
Wiring Cleaned and Going In
Fixed Boards Ready
Fixed Boards Ready
Rust Everywhere
Rust Everywhere
Wired and Mounted
Wired and Mounted
Powder coated Metals
Powder coated Metals
Monitor In and Working
Monitor In and Working
Cleaned and Taped
Cleaned and Taped
Next Cleaning and Adjustment
Next Cleaning and Adjustment
Ready for De-Rusting
Ready for De-Rusting
Ready to go Back Together
Ready to go Back Together
Back Together
Back Together
New Rubber Grommet
New Rubber Grommet
Polished
Polished
Control Panel Done
Control Panel Done