Album - 2001 Slam Dunk Arcade Machine

This is in for some new red laminate on 2 sides and gluing what has lifted on the other 2 sides.

Red vertical-grade laminate has been ordered (it won't match, but it should be close). The broken and pulled-away laminate is being removed (what a pain). Next is wood filler and sanding prep for the new laminate.

To be replaced
Upper to be glued
Middle to be replaced
Lower to be glued
Side to be glued
Scraping
Being Stubborn